COPERTINA SITO

Heating Plant

Heating Plant

ADVANTAGES
  • Efficient operation;
  • Easy plant maintenance;
  • Easy to install. Container version avoids building work;
  • Low labour costs as the heating cycles are temperature adjustable.
The heating plant supplies hot water to pipes within the production bed to speed up the curing of the concrete.

The heating plant can be supplied separately or already assembled within a 20 or 40 ft. container depending from the size of the plant, ready for use and able to be placed in the desired position within the production factory.

The heating cycle is fully controlled and managed by a maturity control system device.


Gallery

Heating Plant
Heating Plant
Installation of the Heating Plant container
Installation of the Heating Plant container
Large manifold capable of serving up to 16 casting beds
Large manifold capable of serving up to 16 casting beds
Large manifold capable of serving up to 16 casting beds
Large manifold capable of serving up to 16 casting beds
Heating Plant-hot water system (in a container)
Heating Plant-hot water system (in a container)
Hot water system heating plant fitted in a purpose built boiler room
Hot water system heating plant fitted in a purpose built boiler room
High efficiency burner
High efficiency burner
Primary pumping circuit manifold
Primary pumping circuit manifold
Pumps for the secondary pumping circuit to the production bed
Pumps for the secondary pumping circuit to the
Big manifold to serve up to 16 casting beds
Big manifold to serve up to 16 casting
Big manifold to serve up to 16 casting beds
Big manifold to serve up to 16 casting
Pressure gauge with in-flange type ball valve for each production bed
Pressure gauge with in-flange type ball valve for each production bed
Nordimpianti System Srl
  • Via Erasmo Piaggio, 19/A
    66100 Chieti (CH) - Abruzzo | Italy
    T. +39 0871 540222 - F. +39 0871 562408
  • info@nordimpianti.com
  • PI / VAT No. 01276540687
    • @ 2016 Nordimpianti | All Rights Reserved