The most economical method is to use a bucket hooked to a overhead crane. In cases where quick and high volume production is required it is possible to use fly buckets and concrete distributors which follow the casting machines along the production bed reducing the time needed to deliver the concrete.
Nordimpianti has developed different transport and concrete distribution systems to meet a wide range of production and economic requirements.